Pump Control Panels & Accessories
Explore Ganquan pump control panels, motors, cables and installation accessories for pumping systems. Equipment selection depends on pump and motor specifications, available power supply, control requirements and site conditions.
Tell us what you need for a new installation, replacement or system upgrade. Share the pump and motor nameplates, available power supply and any drawings or photographs. We can help review compatible equipment and clarify the items required for your project.

Built for your pump and your grid, not pulled off a shelf. Tell us the motor power, the voltage and how the station is run — we match the panel, starting method and protection to it.
Applications for Pump Control Panels & Accessories
New Pump Installations
Coordinate controls, cables and installation accessories for a new pumping system, with components matched to the selected pump, motor and site requirements.
Equipment Replacement
Review replacement motors, control panels and accessories using the existing equipment specifications, nameplate details and connection dimensions.
Control System Upgrades
Review control options for existing pumping systems, including starting arrangements, level or pressure control and monitoring requirements.
Control & Accessory Options
The following equipment categories support pump installation, operation and maintenance. Each item needs to be matched to the selected pump and motor, electrical supply and installation arrangement.
| Equipment Category | Typical Options | Selection Focus |
|---|---|---|
| Control panels | Soft-start panels and dedicated pump control cabinets | Motor ratings, supply voltage, starting requirements, protection and site conditions. |
| Automatic control & monitoring | Pressure control, level control and pump station monitoring | Number of pumps, sensors, operating sequence, alarms and communication requirements. |
| Pump motors | Submersible motors and matched motor packages | Required power, speed, voltage, shaft and flange dimensions, cooling and operating temperature. |
| Cables & connections | Pump power cables and connection accessories | Motor current, cable length, voltage drop, temperature and installation conditions. |
| Installation accessories & spare parts | Pipes, valves, couplings, guide rails and model-specific spares | Dimensions, pressure rating, materials, interfaces and compatibility with the equipment. |
Matching power ratings alone do not establish compatibility. Mechanical connections, electrical characteristics and operating conditions must also be checked. Accessories and spare parts are included only where specified in the quotation; the final supply scope will be confirmed item by item.
Equipment & Compatibility Details
Tell us what equipment you need and which pumping system it will support. The details below help us check compatibility and define the required supply scope.
- Project purpose: new installation, equipment replacement or control system upgrade.
- Pump and motor details: manufacturer, model and clear nameplate photographs, including power, voltage, current, frequency and speed where available.
- Required items: controls, motors, cables, installation accessories or spare parts, including quantities.
- Power supply: available voltage, frequency and single-phase or three-phase supply.
- Control requirements: number of pumps, starting method, manual or automatic operation, level or pressure control and any monitoring needs.
- Mechanical connections: relevant shaft, flange, pipe and mounting dimensions, supported by drawings or photographs.
- Cable requirements: installation route, required length and any existing cable specifications.
- Operating environment: indoor or outdoor location, temperature, moisture, dust and any specified enclosure requirements.
- Existing system information: wiring diagrams, equipment lists and details of any faults or performance problems.
Provide the details relevant to the items you need. If specifications are missing, start with existing records and clear photographs of accessible nameplates and connections. We can help identify what still needs to be confirmed before equipment is proposed.
Low-Voltage Equipment Certifications
Ganquan’s GCS and MNS low-voltage withdrawable switchgear and GGD AC low-voltage distribution cabinets are covered by CQC voluntary product certification. The certificates reference GB/T 7251.2-2023 and show an issue date of 6 May 2025.
| Model | Certificate No. | Certificate expiry |
|---|---|---|
| GCS | 2016010301884738 | 2 August 2031 |
| MNS | 2018010301075281 | 24 April 2033 |
| GGD | 2016010301884742 | 2 August 2031 |
How your RFQ moves
- Tell us the motor power, your grid and how the station runs
- We select the panel and starting method — GQRK soft start, autotransformer or GBS variable-frequency constant pressure, with GCS/MNS/GGD switchgear as needed
- You receive a written quotation with configuration, parameters and lead time
- Production at our Tianjin facility — panels are built in-house and CQC-certified
- Every panel is tested before dispatch
- Shipment with packing list and documents
You know which step your order is at — no silent weeks.


Before you compare quotes, check these five lines
- Motor power and grid strength — a weak grid plus direct-on-line starting is how breakers trip; soft start or autotransformer starting belongs in the quote.
- Starting method — GQRK soft start, autotransformer or GBS variable frequency: different solutions for different grids and duty cycles.
- Protection list and level control — leak, phase-loss, short-circuit, overheat and overload protection, plus float switches for unattended stations.
- Switchgear series and certification — GCS, MNS and GGD all carry CQC certification (numbers available). CQC is a Chinese voluntary certification, not CE.
- Lead time and pump compatibility in writing — panels are designed and built in-house, so pump and panel carry one warranty body.
A cheaper quote that skips these lines usually costs more later.
Frequently Asked Questions
Do we have to buy the control panel with the pump?
Not mandatory, but recommended: pump and panel are designed and built in-house, so one order gives you one delivery and one warranty body. You can also buy the pump alone and get our electrical specification.
Do your panels carry CE?
Currently our low-voltage panels carry CQC voluntary certification (GCS, MNS, GGD — certificate numbers available), not CE. If your project mandates CE, we confirm the certification plan with the factory before answering.
Our grid is weak and a 200 kW pump trips the breaker on startup. What helps?
A GQRK soft-start cabinet or an autotransformer starter, covering 1.5–400 kW. Send us the motor power, voltage and your grid’s short-circuit capacity and we will confirm the configuration with the factory.
Tell Us What Your Pumping System Needs
Tell us your project location and which controls, motors or accessories you need. Include the pump and motor details, quantities and whether this is a new installation, replacement or upgrade. We can help review compatibility and clarify the supply scope for a quotation.
Start with the information you have. Clear nameplate photographs, existing equipment lists and drawings can help us identify suitable options. If a model or specification is unknown, simply tell us.



